September 20, 2008

Stepping Stones for Bonnie

Ss06Uncast the last 4 stones this morning. Washed, let dry and stacked in the car. We delivered to Bonnie Saturday afternoon (since she was hosting the LSU/Auburn game). We stacked them into a big garbage bag, added water and gave her instructions to let them sit at least 2 weeks in the water before putting them in use. She really liked the stones, Beau likes have the concrete mix out of the shed ... this one was a double win

No comments: